HYDRO
ELECTRIC POWER , PUMP STORAGE
AND BATTERY STORAGE.
Terence
Cardwell
![]() |
| TUMUT 1 HYDRO ELECTRIC POWER STATION. |
There has been so much talk and
false information about Hydro Electric Power Stations, pump storage and System
battery storage that I felt it was time to put the facts straight.
Some of the most incorrect and misleading
information is from self appoint university experts who have made all sorts of
ridiculous statements. As well as from some politicians who either live in
fairy land or are deliberately lying. You decide.
Do I know what I’m taking about; I
was with the Electricity Commission of N.S.W. for 26 years in a number of
positions including the commissioning and in charge of the Coal Fired Thermal
Generators at Tallawarra, Wallerawang and Munmorah Power Stations.
As part of our job we supplied
power for the Snowy when required and of course supplied and controlled the
State power grid along with a number of other power stations.
Without doubt the Snowy Mountain
Hydro Electric Scheme is the greatest project Australia has ever undertaken. A
magnificent project that the governments of today would be incapable of
matching. Why; because they lack the vision, the courage and the foresight to
plan and create such a project.
The money that should be put into this type of
project being wasted on almost useless Wind and Solar Farm subsidies. Then
billions more to the U.N. in the name of ‘Global Warming’ which after nearly 40
years still does NOT have a shred of proof that our climate is affected by man.
The Snowy River has
the greatest source of water in Australia and draws away a large proportion of
the waters from the south-eastern New South Wales snowfields.
Prior to the ‘Snowy scheme’s’ construction
nearly all the water from the Snowy Mountains in the Australian Alps flowed down through mountainous and practically
uninhabited country until discharging onto the river flats of East Gippsland, and a major
proportion of its waters flowed wasted into the sea.
This was while the
inland regions of NSW on the inland side if the Australian Alps desperately
required water for irrigation.
After a great deal
of planning the idea of the Snowy River Scheme was created and was considered
and excellent means of employment for the new migrants coming from all over the
World.
The primary
intension was to turn the waters inland as well as maintain a flow to the Snowy
River. The ability to generate hydro Electricity was a major bonus to the
original plan.
The construction began in 1949 and
was finally completed by 1974.
It consists of sixteen major dams; seven power stations; two
pumping stations; and 225 kilometres (140 mi) of tunnels, pipelines and
aqueducts. The Scheme was completed under the supervision of Chief
Engineer, Sir William Hudson and is the largest
engineering project undertaken in Australia.
The melting snow and rainfall flows into the Snowy River and
some of its tributaries, much of which formerly flowed southeast onto the
river flats of East Gippsland, and into Bass Strait of
the Tasman sea,
is captured at high elevations and diverted inland to the Murray and Murrumbidgee Rivers irrigation areas,
through two major tunnel systems driven through the Continental Divide of
the Snowy Mountains, known in Australia as
the Great Dividing Range. The water falls 800
metres (2,600 ft) and travels through large hydro-electric power stations
which generate power generally for peak-load for New South
Wales EC of NSW two thirds, Victorian power one third and small amount
for the ACT.
|
Hydro-electric
power station
|
Installed
capacity
|
Year completed
|
|
60 megawatts
(80,000 hp)
|
1955
|
|
|
330 megawatts
(440,000 hp)
|
1958
|
|
|
286 megawatts
(384,000 hp)
|
1961
|
|
|
80 megawatts
(110,000 hp)
|
1967
|
|
|
950 megawatts
(1,270,000 hp)
|
1967
|
|
|
550 megawatts
(740,000 hp)
|
1969
|
|
|
1,650 megawatts
(2,210,000 hp)
|
1974
|
|
|
Tumut 3 Micro Hydro
|
0.72 megawatts
(970 hp)
|
2004
|
|
Jounama Small Hydro
|
14.4 megawatts
(19,300 hp)
|
2010
|
|
Jindabyne Dam Mini Hydro
|
1.1 megawatts
(1,500 hp)
|
2011
|
The total installed capacity is 3.772
gigawatts (5,058,000 hp).
The added
bonus of the Hydro electric generators is; They not only made it possible to
supply cheap power for the states but also enabled a share the load of the
spinning reserve of the power supply grid system.
Hydro
Electric generators can be run up to full load in two minutes. No expansion
problems, no fuel feed problems, just a quiet smooth run up to synchronise and
then to full load if required.
Also the
lower Hydro stations such as T3 can run three of their generators in reverse
and (when available) pump the water back up to the higher levels. But this does
not come free and requires 25% more power than they generate.
But this
is offset by the improved efficiency of the Thermal coal fired power stations
supplying the power.
The
maximum thermal efficiency in a coal (or gas ) fired power station is at full
load due to maximum heat transfer in the boilers and minimum heat loss. As the
units decrease in load so does the thermal efficiency.
The units
at Munmorah power station For example; At full load of 350 MWs generate power
at 10,000 b.t.u. per kilowatt. At 180 Megawatts that falls back as low as
14,000 B.T.U. per kilowatt.
When the
units are doing load control and are down in load in the early mornings, due to
reduced demand, this is the time power is supplied to the Snowy Hydro units to
pump the water back up to higher level.
By
increasing the unit load the efficiency is increased and that gain is offset
against the 25% loss of pumping the water back up. This can reduce the overall
loss to as low as 12% approx..
Pumped
Hydro has always existed at the Snowy but it is ONLY available when the water
is available and that is after the snow melt and any rainfall. By mid to late
summer there is little to spare but depends on amount of snowfall and rain.
The
primary purpose of the Snowy Scheme is to provide permanent water flow for irrigation
inland to the Murrumbidgee and Murray rivers. Plus a few tributaries and the
Snowy River on the eastern side.
The idea
that pumped Hydro is some sort of new saviour is typical Green day dreaming.
Where do they think the power comes from to do it.; Thermal Power Stations.
Without
them there is no power to drive the Hydro pump/generators. Also it is not the
pumping water back up is the answer, it is sufficient water/snow falling on the
Snowy mountains to be able to do it.
Increasing
the storage capacity may make a slight improvement but knocking down the
Thermal power Stations without building replacement new ones is insane to say
the least.
I and many
others in the power industry have said that knocking down Thermal Power
Stations without replacement is absolute insanity. The mass destruction of
these power stations, initiated and organised by the Green Communists, will be
the downfall of our power industry and both sides of politics are too stupid to
see it.
The grid
system ALWAYs had a spinning reserve of 20% of load. This has now gone and the
power supply companies have moved us much closer to blackouts and power
failures that most certainly will be occurring in South Australia and probably
Victoria.
The sale
of the power industry to private enterprise is the worst thing that the
previous governments could have done. It was almost an act of treason placing
our total existence in the hands of the overseas moguls whose only interest is
to extract as much money as possible and could NOT give a damn about
reliability of power supply for Australia.
Worse is
the Green Communists whose plan is to totally destroy the thermal power stations
and put Australia on her knees.
Instead of
wasting so many billions of dollars on unreliable and inconsistent Wind
generators and solar farms the State and Federal governments could build the
latest high efficiency, low emission power stations of say 4 x 660 Megawatts
for two billion dollars each.
The idea
of building battery storage is ludicrous. A thermal Generator say Bayswater’s 4
x 660 Megawatt generators supplies 63,360 Megawatt hours in 24 hours and add
infinitum.
The
battery bank storage in S.A., drawing power from the grid to charge the
batteries, will supply less than 100 Megawatts for ONE HOUR. The supply After
that nothing.
The
suggested construction of battery storage by the Turnbull government is just as
ridiculous with the same result. A TEASPOON of power for a VERY short time when
they should be building ASAP new thermal power stations.
For not too much more cost you can
have 633.6 times more power and add infinitum.
The Green
Communists say coal is finished—that is why there is over 700 of them being
built right now in India, China, USA, Europe and South America and many other
places.
The People
of Australia may start to listen when they are sitting in the dark with no
power for their employment or business. Maybe then it might sink in that they
have been lied to and deceived for years.
One tip I
can give and that is for residents in the southern states to buy a 5 Kilowatt portable generator. There is every
possibility you will need it.